Owner/Developer****************************************** Gannett Co., Inc.
Architect****************************************** Kohn, Pedersen, Fox Associates (KPF)
General Contractor****************************************** The Clark Construction Group, Inc.
Our scope on this project included the cladding of the entire parking garage
with 3/16” perforated aluminum panels totaling 25,000 SF. The Panel System
was attached to an engineered tube frame system. In addition, 2” Foam Panels
by Centria and 4mm Composite Panels by Reynobond were utilized at the
heliport area and the stairtowers. Kristen Saah was the project manager
on this project which was completed in September 2001.